| Building Permit Fee | $.16 per square foot of living area |
| $.09 per square foot of decks, garages, etc. | |
| Homeowner Recovery Fund | $10.00 |
| Availability Fee (water & sewer) | $0.80 per heated square foot, for water |
| $0.80 per heated square foot, for sewer | |
| Water Tap Fee | $925 |
| Sewer Tap Fee | $925 |
|
Utility accounts must be set-up with the utilities clerk before a water meter will be set or a sewer tap made |
|
| Water or Sewer Connection | $200 if pavement cut is required. Permit Required |
| Setbacks | 20 feet from road right-of-way or front lot line |
| 15 feet from side and rear of lot lines | |
| 30 feet from golf course | |
| Electric, Phone & Cable TV service must be buried | |
| Parking area must be constructed prior to the beginning of construction, for storage of building materials | |
| A port-a-john must be on site before construction begins | |
| Permits must be obtained prior to clearing any trees | |
| All water, sewer and electric lines must be inspected prior to being covered | |
| Sewer and Water, and Electric Lines, must be buried in separate ditches, however, the Sewer and Water Lines must be separated a minimum of eighteen (18) inches | |
| No Electric Service Cables will be allowed to be buried in corrugated drain tile unless it is wrapped with RED ELECTRICAL HAZARD tape, otherwise only direct bury or in conduit will be accepted | |
| Sewer Lines must have a clean-out every 100 feet | |
| No Retaining Walls or Trees Planted within a 5 Foot Radius of Water Meters | |
| No Building may be occupied until a Certificate of Occupancy has been issued | |